Checks
What we check after the move
These are the checks Naqla runs after every move and shows in your report. The list is taken from the check names in the software, so we never promise a check that does not run.
Only three results
- Passed: the check ran and passed.
- Failed: the check ran and found a problem. The move does not count as successful.
- Not tested: we could not run it (before the domain switch, for example). It never shows as passed.
Files
Every file is there
We compare the old site's file list with the new one, file by file. One missing file can be a product photo or a config file that stops the site.
files presentFile sizes match
A file that is there with another size arrived cut (the connection dropped half way). We catch it here before a visitor does.
file sizes match
Database and Arabic text
Every table has the same number of rows
We count the rows of every table in both databases. An orders or users table with missing rows means lost data.
db row counts matchThe bytes of Arabic text are unchanged
We read a sample of non-English text on both sides and compare it byte for byte. That is how Arabic turned into question marks or odd symbols is caught, even when the row counts match.
text bytes unchangedThe encoding layers match
Arabic text passes six layers: the columns, the database, the site's connection to it, PHP's setting and the page. We make sure they are the same on the new host as on the old one.
encoding layers match
The site on the new host
The site answers on the new host
We request the home page from the new host under your site's name, before any visitor is sent there.
target site respondsNo database connection error
An "Error establishing a database connection" page means a wrong setting. We look for it before your customer sees it.
no database connection errorThe page has what it should
We make sure the new page carries your site's content (a text we know from it), not the host's default page.
page containsInner pages work
We request up to 8 inner pages from the sitemap on both hosts and compare their title and content. A host that ignores the link rules serves the home page for every link, and we catch it here.
deep pages matchProtected folders stay closed
A folder closed on the old host (by an htaccess file) can open on a host that does not read those files. We request a file from it on the new host and fail the move if it is open.
protected paths stay closed
The domain and the certificate
The HTTPS certificate covers the site's names
After the domain switch we make sure the certificate is valid for the site's name and www. Before the switch it shows "not tested yet", never "passed".
certificates cover the served namesDNS records kept
We keep the domain's records before the move (mail, SPF, DKIM, DMARC, subdomains) and compare them after the switch. The most common loss of a move is not a file but a forgotten mail record, and mail stops days later.
DNS records keptThe names point to the new host
After the switch we make sure the site's name really reaches the new host. We check again on our own every 30 minutes until it does, for up to 48 hours.
the names point to the new host
Every message arrived
We count the messages of every folder of the old mailbox and make sure they are all in the new one.
mail messages presentThe folders moved
The folders you sorted your mail into move with their names.
mail foldersFolders other than the Inbox (with POP3)
If the old mailbox only allows POP3, it only sees the Inbox. The report says "not tested" instead of claiming everything moved.
mail folders other than the InboxRead and flagged marks
A message that was read or flagged stays so in the new mailbox.
mail flags
A real report from the lab
A report Naqla wrote itself after a move in our lab (test domains, no customer data): a WordPress site moved, then the domain's records were switched and the checks ran again.